No. 8E - August 1995
Limit values on emissions from waste incinerators are strict in order to reduce the negative effects of emissions of acidic components and micropollutants. Only residual waste is allowed to be inicinerated. 20 percent of the municipal waste in Norway in 1994 was incinerated. There are presently 8 municipal plants, 3 plants for hospital waste, and 6 that only incinerate biological/pathological waste.
The most serious negative effects of waste incineration are the emissions to the air. These emissions contribute to the formation of acidic components and spread heavy metals like cadmium, mercury and lead, as well as microorganic pollutants like PAH and dioxins into the environment. The level of emissions are to a great extent dependent on how well the cleansing systems for the emissions work. The main goal is to reduce the level of micropollutants to as low level as possible because these pollutants never or very slowly break down and therefore accumulate in the food chain.
The micropollutants dioxins, mercury, cadmium are considered the most serious problems in relation to waste incineration. Dioxins are considered to be the most poisenous material in existance. It breaks down very slowly and accumulates in the food chain. Mercury is very poisenous and bioaccumulates. Cadmium is poisenous for organisms living in water and accumulates in these organisms. Furthermore can kidney damage occur as well as mutagenic effcts, and reduced ability for reproduction in humans and animals.
Waste incineration also leads to emissions to water from wet scrubbers and from the landfill site where slags and ashes are landfilled. Noise and odour may be a problem related to waste incineration, but it is considered a small problem. Increased traffic may have an impact locally.
71 percent of the total amount of municipal waste is landfilled, 20 percent is incinerated, 1 percent composted, 4 percent is sorted for recycling at the waste treatment facility, and 4 percent goes directly to a material recycling facility.
Presently there are 5 large waste incineration plants for municipal waste with a capacity of more than 5 tons per hour. The level of energy recovery in these plants is between 20 percent and 80 percent, with a total level of energy recovery at aproximately 60 percent. There are 3 small and medium sized plants for municipal waste and 3 for hospital waste. In addition permits have been issued to 6 hospitals for incinerating biological/pathological waste only. The incinerators are equipped with advanced gas cleansing systems. The incinerators that only incinerate biological/pathological waste are only equipped with a simple separator for particulates. The residues from the cleansing processes are landfilled at a landfill site for hazardous waste. The bottom slag is landfilled at regular sanitary landfills, and may be used as filling material in roads etc.
Several directives and regulations must according to the EEA agreement be implemented in Norwegian laws. This includes the following council directives:
In Norway waste incineration have so far been regulated in individual permits issued to the plant owner. A separate regulation on incineration of municipal waste referring to the two council directives have been adapted, since the permit system has not been considered as sufficient implementation of the council directives on incineration of municipal waste. Norway therefore implemented the above mentioned council directives in Norwgian law in Regulation of May 24. on incineration of municipal waste. The requirements put forward in the indvidual permits are stricter than the council directives so the regulation have in fact no practical consequences for the Norwegian plants.
Municipal waste incineration plants are only allowed to incinerate residual waste. This means waste that for technical or socioeconomic reasons can not or should not be reused or material recycled.
A separate evaluation of necessary limit values and other requirements are made in each case based on local conditions such as topographic conditions, air quality and the location of waste recycling facilities. In the tables below an overview of the requirements in the current permits are given. New waste incineration plants may receive stricter limit values.
| Pollutant | Limit values 1) | Measurements | Instruments for continous surveillance | ||||
| 12 hour average mg/Nm3 | 1 hour average mg/Nm3 | Measure- ment frequency | Sampling number pr measure- ment | Minimum sampling time | Logging frequency | Minimum time pr registr | |
| Particulates | 30 | yearly | 4 | 1 hour | 1 hour | 1 hour | |
| Hg | 0,05 | yearly | 4 | 1 hour | - | - | |
| Cd | 0,05 | yearly | 4 | 1 hour | - | - | |
| Pb+Cr+ Cu+Mn | 5 | yearly | 4 | 1 hour | - | - | |
| Ni+As | 1 | yearly | 4 | 1 hour | - | - | |
| CO | - | 100 2) | yearly | cont | cont | 5 min | 1 hour |
| HF(uorg. fluorid ) | 2 | yearly | 4 | ||||
| HCl (uorg klorid(g)) | 50 | yearly | 4 | 1 hour | 1 hour | 1 hour | |
| TOC | 20 | yearly | |||||
| SOx (SO2) | 300 | yearly | 4/cont | 1hour | 1 hour | ||
| Dioxins | 2 3) | - | yearly | 3 | 3 hours | - | - |
| Pollutant | Limit values 1) | Measurements | Instruments for continous surveillance | ||||
| 12 hour average mg/Nm3 | 1 hour average mg/Nm3 | Measure- ment frequency | Sampling number pr. measure- ment | Minimum sampling time | Logging frequency | Minimum time pr. registr. | |
| Particulates | 100 | yearly | 4 | 1 hour | 1 hour | 1 hour | |
| Hg | 0.1 | yearly | 4 | 1 hour | - | - | |
| Cd | 0.05 | yearly | 4 | 1 hour | - | - | |
| Pb+Cr+ Cu+Mn | 5 | yearly | 4 | 1 hour | - | - | |
| Ni+As | 1 | yearly | 4 | 1 hour | - | - | |
| CO | - | 100 2) | yearly | cont | cont | 5 min | 1 hour |
| HF(uorg. fluoride ) | 4 | yearly | 4 | ||||
| HCl (uorg. chloride(g)) | 100 | yearly | 4 | 1 hour | 1 hour | 1 hour | |
| TOC | 20 | yearly | |||||
| SOx (SO2) | 300 | yearly | 4/cont | 1 hour | 1 hour | ||
| Dioxins | 2 3) | - | yearly | 3 | 3 hours | - | - |
1)Referred to 11 vol% O2, Temp. 273K, Pressure 101,3 Pa
2)1/2 hour average up to 150 mg/Nm3 a is accepted
3)ng/Nm3 2378 TCDD-equivalents (Nordic standard)
| Pollutant | Limit value | Surveillance measurement | Instruments for continous surveillance | |||
| 12 hour average mg/Nm3 | Measure- ment frequency | Sampling numbers pr. measure- ment | Minimum sampling time pr. sample | Logging frequency | Minimum sampling time pr. reg. | |
| Particulates | 100 | every 2 year | 4 | 1hour | 1 min | 1 hour |
| Hg | 0,1 | every 2 year | 4 | 1hour | - | - |
| HCl (uorg. chloride(g)) | 150 | every 2 year | 4 | 1hour | - | - |
| CO | 100 1) | every 2 year | cont. | cont. | 1 min | 1 hour |
1) The requirement for CO is hourly average
| Pollutant | Limit value | Measurements | Minimum sampling time pr. sample | Measurement instruments |
| pH Hg | 6-10 0,002 mg/l | continously weekly/logged * | logging over 12 hour weekly mixed sample ** | continously water sampler proportional to the water flow |
| Cd | 0,005 mg/l | monthly | weekly mixed sample** | « |
| Pb | 0,05 mg/l | monthly | weekly mixed sample** | « |
| suspend material | 10 mg/l | monthly | weekly mixed sample** | « |
| temp | 50°C | monthly | logged over one week | continuosly |
| SO42- | municipal limit values | monthly | weekly mixed sample ** | « |
| Cl- | municipal limit values | monthly | weekly mixed sample ** | « |
The limit values are related 250 l vann per tonn waste. Norwegian Standard for sampling shall be used when this exist.
* The use of continous sampling instruments may reduce the number of mesurements
** Each sample is related to the waterflow in the plant.
| Parameter | Requirement | Logging frequence |
| Temperature i the secondary zone | > 850 °C | 1 min |
| Time in the secondary zone after last injection of combustion air | > 2 seconds | |
| Ignition loss in bottom slag | < 5 % C by weight | 4 times/year |
| Plant* | Address | Type of waste/amount |
| Fredrikstad vann avløp og renovasjonsselskap (FREVAR) 2 plants | PO Box 1115 1631 Gml. Fredrikstad | 1.Municipal and production waste/9 tons/hour 2.Hospital waste/600 kg/hour |
| Oslo Kommune Renholdsverket Klemetsrudanlegget | PO Box 4533 Torshov 0404 Oslo | Municipal and production waste waste from health care facilities pharmaceutical waste/20 tons/hour |
| Oslo Kommune Renholdsverket Brobekkanlegget | PO Box 4533 Torshov 0404 Oslo | Municipal and production waste waste from health care facilities pharmaceutical waste/13 tons/hour |
| Trondheim Energiverk | Sluppenvegen 6 7005 Trondheim | Municipal and production waste waste from health care facilities/12 tons/hour |
| Tafjord Kraftselskap Ålesund Forbrenningsanlegg | Postboks 8055 Spjelkavik 6022 Ålesund | Municipal and production waste waste from health care facilities/5 tons/hour |
| Hallingdal Renovasjonsselskap | Kleivi 3570 Ål | Municipal and production waste/3 tons/hour |
| Senja avfallsselskap A/L | Botnhågen 7300 Finnsnes | Municipal and production waste/1,1 tons/hour |
| Årdal kommune | 5875 Årdalstangen | Municipal and production waste/1,3 tons/hour |
| Nord-Trøndelag Fylkeskommune Innherred sykehus | Fylkeshuset 7700 Steinkjær | Hospital waste/350 kg/hour |
| Troms Fylkeskommune Regionsykehuset i Tromsø | 9038 Tromsø | Hospital waste/200kg/hour |
| Sør-Trøndelag Fylkeskommune Regionsykehuset i Trondheim | Kyrresgt. 17 7006 Trondheim | Biological/pathological waste/5500 kg/month |
| Hordaland Fylkeskommune Haukeland sykehus | PO Box 1 5021 Bergen | Biological/pathological waste/5000 kg/month |
| Nordland Fylkeskommune Sandnessjøen sykehus | Fylkeshuset 8002 Bodø | Biological/pathological waste/4000 kg/year |
| Nordland Fylkeskommune Stokmarknes sykehus | 8450 Stokmarknes | Biological/pathological waste/2000 kg/year |
| Troms Fylkeskommune Harstad sykehus | St.Olavsgt. 70 9400 Harstad | Biological/pathological waste/2200 kg/year |
| Finnmark Fylkeskommune Kirkenes sykehus | PO Box 410 9001 Kirkenes | Biological/pathological waste/5000 kg/year |
* Bergen Kommune Renholdsverket has a permit to incinerate municipal and production waste that so far has not been used. The Norwegian Pollution Control Authority has in addition under evaluation an application from Vik kommune for incineration of wood based waste and paper waste.
Statens forurensningstilsyn |