Skip navigation
blog

gRig BLOG

Last changed Nov 05, 2007 15:50 by idunn sem

test

Posted at 05 Nov @ 3:48 PM by idunn sem | 0 comments

Just about a month-and-a-half after Steve Jobs's surprisingly unsurprising announcement at the MacWorld Expo in San Francisco that the first two Intel-based Macs to be rolled out would be the iMac and the MacBook Pro--the apparently newly renamed PowerBook--MacBook Pros finally started arriving at eager users' doorsteps. The six-week gap between announcement and arrival was plenty of time for rumors to grow.
There were rumors that the floor models available at MacWorld were mere prototypes and that the final design of the MacBook Pro was not even finished yet. There were rumors of chip shortages. There were even rumors that excessive demand was driving long shipping delays that apparently no one who had ordered immediately after MacWorld was experiencing whatsoever. Luckily, these rumors appear to have been unsubstantiated, and the MacBook Pro started shipping last week exactly as expected.

Well, there was one exception. A mere day before they were originally slated to start shipping to the masses, Apple bumped the chip speedof both the high- and low-end models of the MacBook Pro from 1.83GHz to 2.0GHz and from 1.67GHz to 1.83GHz, respectively (with a 2.16GHz version available for built-to-order machines). While mystifying, no one was arguing with that, even if it did push everyone's shipping back by one more week.

That said, they're all finally rolling out, with the 2.0GHz versions shipping first and then the 1.83GHz versions in short pursuit. Here at the Orbiting HQ, we acquired a 1.83GHz MacBook Pro for review and have had an eventful time doing so.

Posted at 08 Oct @ 8:30 PM by Jeremy Toussaint | 1 comment
Labels: macbook, pro, supposed

Just about a month-and-a-half after Steve Jobs's surprisingly unsurprising announcement at the MacWorld Expo in San Francisco that the first two Intel-based Macs to be rolled out would be the iMac and the MacBook Pro--the apparently newly renamed PowerBook--MacBook Pros finally started arriving at eager users' doorsteps. The six-week gap between announcement and arrival was plenty of time for rumors to grow.
There were rumors that the floor models available at MacWorld were mere prototypes and that the final design of the MacBook Pro was not even finished yet. There were rumors of chip shortages. There were even rumors that excessive demand was driving long shipping delays that apparently no one who had ordered immediately after MacWorld was experiencing whatsoever. Luckily, these rumors appear to have been unsubstantiated, and the MacBook Pro started shipping last week exactly as expected.

Well, there was one exception. A mere day before they were originally slated to start shipping to the masses, Apple bumped the chip speedof both the high- and low-end models of the MacBook Pro from 1.83GHz to 2.0GHz and from 1.67GHz to 1.83GHz, respectively (with a 2.16GHz version available for built-to-order machines). While mystifying, no one was arguing with that, even if it did push everyone's shipping back by one more week.

That said, they're all finally rolling out, with the 2.0GHz versions shipping first and then the 1.83GHz versions in short pursuit. Here at the Orbiting HQ, we acquired a 1.83GHz MacBook Pro for review and have had an eventful time doing so.

Posted at 08 Oct @ 7:01 PM by Jeremy Toussaint | 0 comments
Last changed Sep 24, 2007 14:40 by Jeremy Toussaint

Data Ecologies + gRig interim mee|ting
See pictures from the event

Posted at 23 Aug @ 1:09 PM by idunn sem | 1 comment
Last changed Aug 01, 2007 09:17 by idunn sem

working on transactions, the idea of alternative view-modes of "timeline"/individual project "timelines" has reappeared... to be further developed possably as part of the gRig web-site design.

Posted at 01 Aug @ 9:11 AM by idunn sem | 0 comments
Last changed Aug 23, 2007 11:54 by idunn sem
Posted at 06 Jul @ 4:39 PM by idunn sem | 0 comments
Last changed Sep 30, 2007 11:58 by Jeremy Toussaint
Labels: interactive_institute

some text

Posted at 06 Jul @ 11:51 AM by idunn sem | 0 comments
Last changed Oct 10, 2007 08:21 by Jeremy Toussaint

This text is actually created today, but should simulate a blog entry which occurred last year.

Posted at 10 Oct @ 8:21 AM by Jeremy Toussaint | 0 comments
(None)

Adaptavist Theme Builder Powered by Atlassian Confluence