|Introduction| |Background| |Mision Statement| |Windlab| |Active Research Projects| |Laboratory|

|Research Group| |Courses| |Links|

 

Active Research Projects

Development of Norwegian wind power technology 2001-2005

A cooperation between NTNU, SINTEF and IFE, with financial support from NFR, Statkraft, Norsk Hydro and Umoe Ryving. The project aims to develop Norwegian competence and know-how in wind power technology.

PhD student Bjarne Næss is involved in the electrical part of this project modeling doubly fed induction generators for wind for further experimental validation and investigation of ride through capability of this type of generator.

More information on the project can be found at http://www.energy.sintef.no/prosjekt/vindkraftteknologi/index.asp

Wind Energy Strategic Program 2003-2007

This is a cooperative project between NTNU, SINTEF and IFE, funded by the NFR. This project aims to strengthen Norwegian wind energy competence.

PhD student Thomas Fuglseth is involved in the electromechanical part of this project investigating a new way to reduce the mechanical stresses of the wind turbine and drive train by coordinated control of generator side converter and independent pitch control of the blades.

More information on the project can be found at http://www.energy.sintef.no/prosjekt/SIP/SIP_JOT/wind.asp

Control of a Doubly-Fed Wind Generator Connected to an Unbalanced Grid.

This research is part of a PhD study by Ted Brekken from the University of Minnesota, and investigates a method of controlling a doubly-fed induction generator connected to an unbalanced three-phase grid.  This may allow a wind turbine to continue to produce power, even if the local grid has become unbalanced.  The control reduces 100 Hz torque pulsations, and also reduces current unbalance.

Reactive power compensation in wind farms by use of STATCOM

This research was performed by scientific assistant Jorun Marvik at the Department of Electrical Power Engineering. A simulation model of a wind farm with a STATCOM was developed in PSCAD/EMTDC. Data from the Smøla wind farm was used in the modelling. Vector control technique was implemented in the STATCOM. The performance of the STATCOM during voltage dips in the grid was then tested in simulations.

The control has been implemented in a real converter, and the performance tested experimentally with a 7.5 kW induction generator representing a wind mill. 

Analysis of power system dynamics with large scale wind power integration

This PhD study is being carried out by Jarle Eek and forms NTNU’s contribution to the Nordic Energy Research Project: “Large -scale integration of wind energy into the Nordic grid” with Statnett and Statkraft providing additional funding.

The objective of the study is to contribute in building confidence in models used for power system stability studies including large integration of wind and identify the constraints to wind power integration in the Norwegian grid concerning small signal and transient stability issues. The dissertation will also suggest measures in order to optimize the integration of wind in the Norwegian grid.

 

Back to the main page 

 

To NTNUs main pageTo Dept.s Home Page

Updated: 03/14/05