|Introduction| |Background| |Mision Statement| |Windlab| |Active Research Projects| |Laboratory|

|Research Group| |Courses| |Links|

 

Laboratory Facilities

The Windlab is designed to allow low cost development of prototype devices by providing equipment and modular devices to emulate them as a full system. For example the wind motion could be emulated by driving a generator in such a way that the electrical output mirrors that of a wind turbine in any situation for which a high frequency wind data set is available. The Windlab will also be able to emulate grid conditions, including grid faults and abnormal events like frequency excursions. This can be connected to devices and prove control or protection strategies prior to implementation.

At present the facility comprises generators (two squirrel cage induction machines (SINTEF) in a M-G setup with wind emulator), power converters (two 25 kW Back-to-back power electronics converters, 150 kW expected in March 2005), data acquisition system, DSP based digital control and network components, allowing testing of 55 kW generation devices in real networks. A set of inductors to emulate weak and strong grids and a thyristor controlled short circuit device to realize a safe short circuit in the lab. The system is modular and flexible and can be modified as experiments require. A variety of different control strategies/options may be implemented. It also features a complete set of instrumentation and power measurement equipment.

The facility is a closed area that offers a high ceiling, a wide entrance for large equipment and extensive safety features, a ceiling mounted crane to handle up to 3 Tons. The electrical installation is equipped with a variety of 3 phase, 380/220 VAC 50 Hz, 3 phase, 230/130 VAC, 50 Hz, and 110 and 220 VDC buses. The facility need to be equipped with a line coming directly from the power transformer to have a higher short circuit capacity (> 2000 amps).

Through the cooperation with SINTEF, there is possibility to access the Test Station VIVA AS with a 225 kW turbine and 2.3-3.0 MW turbines by 2005, which may be used for data-validation and measurement comparison.

Through TTO a link to the market will be possible by providing an integrated facility covering experimentation, certification, demonstration and product launch facilities.

 