Drilling and well construction

Key components: Integrated drilling simulator with virtual well bore and visualization; Real time automated interpretation, diagnostics and decision support; Utilization of increased bandwidth from borehole; New work processes, training simulator and experience transfer.


1.1

Integrated Drilling Simulator with Virtual Wellbore

Objectives/deliverables
Virtual Reality RT Integrated Well Construction Simulation Model

  • Demonstration of Integrated Drilling Simulator with Virtual Wellbore
  • Improvements of Integrated Drilling Simulator
  • Ph. D Project “An improved approach to rate of penetration and drillstring vibrations”
  • (Ph D Project on “Model predictive control for drilling” (with Project 1.4))
  • Link to reservoir description

Application of results
Applications of the Integrated Drilling Simulator are:

  • During design to test the Drilling Plan as well as to investigate various what-if scenarios
  • During operations for process control and real-time diagnosis, drilling optimization and forward looking
  • During training and post analysis to assist in knowledge building and experience transfer

Potential effect for improved field operation

  • Cost reduction
  • IOR

Deliverables 2007
These reports and other deliverables will available on the sub-project page (1.1), when completed.

  • Improvements of Integrated Drilling Simulator
  • Demonstration of Integrated Drilling Simulator

1.2

Automated Interpretation,Diagnostics and Advisory in Real Time

Objectives/deliverables

  • Develop methodology and software for improved and automatic decision support and knowledge transfer during well construction
  • PhD project on “Interpretation methods for time based drilling data”

Application of results

  • Improve knowledge transfer
  • Early diagnosis of problems
  • Automatic decision support

Potential effect for improved field operation

  • Cost reduction
  • HSE

Deliverables 2007
These reports and other deliverables will available on the sub-project page (1.2) , when completed.

  • Detailed analysis of historical data made available by participants
  • Development of data pre-processing methodology
  • Development of interpretation methodology


1.3

Work Process, Experience Transfer and Training

Objectives/deliverables

  • Work process evaluation
  • Work process development and testing
  • PhD project on “Experience transfer and training “
  • Well construction training simulator Application of results

Application of results

  • Develop new work processes for well construction adapted to new technologies
  • More optimal Training of well construction

Potential effect for improved field operation

  • HSE
  • Cost reduction

Deliverables 2007
These reports and other deliverables will available on the sub-project page (1.3) , when completed.

  • Work process evaluation and testing
  • Training simulator specification

1.4

Utilization of increased bandwidth from borehole

Objectives/deliverables
Methods for full utilization of increased bandwidth from borehole within

  • Drilling optimization
  • Well control, especially well bore pressure, enables UBD, MPD etc
  • Ph D Project “Model predictive control in drilling” (with Project 1.1)
  • Geosteering, guide the borehole to the optimum placement in a reservoir with use of borehole seismic and two-way communication.
  • Better reservoir description while drilling, either through new sensors or better use of existing technology (Program 2)

Application of results

  • Drilling Optimization
  • Well control
  • Geosteering
  • Improved reservoir description (Program 2)

Potential effect for improved field operation

  • Less downtime - increased production
  • IOR
  • HSE

Deliverables 2007
These reports and other deliverables will available on the sub-project page (1.4), when completed.

  • Report describing how to utilize increased bandwidth from borehole.
  • Suggestions on interpretation methodology, sensors (new and improved) as well as way forward.

Related projects: 1.1 | 1.2 | 1.3 | 1.4 || overview: iO Center ProgramsAll programs

NTNU, 7491 Trondheim, tlf. 73 59 50 00. Kontakt oss
Ansvarlig redaktør: Informasjonssjef Christian Fossen